Skip to content
KC SOLAR SOLUTIONSWe light
KC Solar installation team mounting panels on a roof

Installation service

Installed properly. Powered for decades.

From the first site visit to the final switch-on, our certified installers design, fit and commission your solar system to Ugandan electrical standards - and stay with you long after.

1 day
Typical home install
12 mo
Workmanship warranty
15+
Districts served

How it works

Five steps from request to sunlight

A clear process with no surprises. You see the design and the price before anything is installed, and nothing is paid online.

  1. 1

    Request & survey

    Tell us what you want to power with the Solar Calculator or by calling us. For larger systems a technician visits your home or business to check the roof, cable runs and your appliances.

  2. 2

    System design

    Our engineers size the panels, battery bank, inverter and protection for your real loads and send a clear quotation with a full bill of materials. Nothing is paid online.

  3. 3

    Installation

    Certified installers mount the panels, wire the system to Ugandan electrical standards and label every circuit. Most homes are completed in a single day.

  4. 4

    Commissioning

    We test the system under load, configure the inverter and battery settings, show you how it works and hand over the documentation and warranty cards.

  5. 5

    After-sales support

    A 12-month workmanship warranty, manufacturer product warranties and a support team you can reach by phone, WhatsApp or your online account.

What's included

A complete, safe installation - not just panels on a roof

Every professional installation quotation covers the equipment, the protection and the people needed to do it right the first time.

Installers securing a solar panel
  • Panels, mounting & cabling

    Tier-1 panels on corrosion-resistant rails with UV-rated solar cable and MC4 connectors.

  • Batteries & inverter

    Lithium or gel battery bank with a hybrid inverter configured for your loads and backup priority.

  • Protection & earthing

    DC/AC breakers, surge protection, fused combiner and a proper earth so your home and equipment stay safe.

  • Change-over & wiring

    Automatic change-over (where grid power exists) and dedicated backup circuits for essential loads.

  • Testing & commissioning

    Full load test, inverter and battery configuration and a signed hand-over report.

  • Training & documentation

    A walk-through of your system, a maintenance guide and all product warranty cards.

Where we work

Installations across Uganda

Our crews are based in Kampala and travel countrywide. Delivery and installation fees for upcountry districts are shown on your quotation before you accept. Earliest installation is usually 3 working days after confirmation.

Don't see your district? Ask us - we regularly add new areas.

  • Kampala
  • Wakiso
  • Mukono
  • Jinja
  • Mbarara
  • Gulu
  • Lira
  • Mbale
  • Masaka
  • Entebbe
  • Fort Portal
  • Arua
  • Hoima
  • Soroti
  • Kabale

Good to know

Installation questions

A typical home system (2-6 panels, one battery, one inverter) is installed and commissioned in one day. Business and institutional systems take two to five days depending on size.

An adult should be present to give access, confirm where panels and the inverter go and receive the hand-over training at the end.

No. We use rails and hooks designed for iron sheets and tiles, seal every penetration and leave the roof watertight. Ground-mount frames are available where the roof is unsuitable.

Yes. We size inverters and cabling with headroom so you can add panels or batteries later. Tell us your future plans during the survey.

Ready to switch on solar?

Design your system in minutes with the Solar Calculator, or talk to an engineer first. Either way, you get a clear quotation before any work starts.